• Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Green Home Builder

  • Home
  • About Us
    • About The Team
    • Production
    • Sustainability
    • Why Build with Steel?
    • Light Steel Industrial Structures
  • Articles
  • Procedures
  • Standard Designs
  • Portfolio
  • Contact
You are here: Home / Archives for Slider Featured

Slider Featured

February 27, 2016 By Mark Bishop

Latest projects from October -16 to January -17

 

Green Home Builder UK (GHB-UK) specialize in the design, manufacture( though our partners) and installation of light steel Modular type buildings.. The light gauge steel frames are extremely versatile they can offer extensive scope in design and with massive configuration innovations making this a really super way to build many types of structure.

Our Buildings are built mostly using steel meaning our light gauge frames are made from Galvanised steel which is rolled and processed to order, then cut and pre drilled, before being pre-built into the relevant sections.

Then each section is coded and batched together with a number of similar panels in a batched sequence before the delivery to site. This ensures that all frames can be unloaded and assembled on site with maximum speed and efficiency.

The GHB-UK team is constantly applying and improving innovation to all stages including design manufacture and build stages.

We believe that our expertise in light steel frames construction, combined with our ongoing partnership with VIP BG enables GHB-UK to offer unequalled levels of service, quality and excellent value for money.

You  can see  below from 3 D visualization of the project first, to the frame layout on site , first floor frames installation, then 2nd floor then roof then building enclosure, the whole process in this project took around 6 weeks, this house will be finished end of january 2017, our buildings are highly efficient to build and own, the sites are very clean with minimal waste and are highly cost effective not just to build but also to run on a yearly basis.

 

Frame lay out on site

Ground floor level
First floor level

Building starting to be enclosed

 

This 250m2 4 bedroom house is being built now- it was started October 2016 and is on going – EDD is end January 2017.

Filed Under: Slider Featured, Uncategorized

January 30, 2016 By Mark Bishop

Aluminium bi fold door ideas

3 part  Bi folding doors in dark grey outside and inside.

5-6-7 Part Bi folds in Grey Brown and white.

Heavy duty Running gear with Secondary door and prime door handle options .

Filed Under: Slider Featured, Uncategorized

January 25, 2016 By Craig McIntosh

Procedures

The Build  with ordering  processing steps

All of our House and buildings are produced using the best available EU certified and guaranteed products that are suitable and comply with any EU Country and their local building regulations.

plans  plans approved

Simple Steps to having your  very own Green Home.

  • We meet you with one of our designers to generate ideas and of course to hear yours.
  • You engage A local architect who will design for you the initial design for the new build/project,(We can be present at this stage if/when required). so they know what structure they are designing for.
  • You will receive the detailed plan from the local architect, that are compliant to the relevant local area building regulations and control, compliant for structural integrity and heat loss and air tightness, then you would submit to us, so that we can present to our steel frame structural engineers, who’s role it is to design the architect’s project from steel, this to ensure  that what we produce is compliant to the local architect plans, compliant therefore with the local building regulations and codes.
  • Then our completed draft, which are detailed and compliant structural plans, these are sent to the client/Local architect to confirm and agree, because it’s the local architect who has the responsibility to sign off on the house that it is compliant to Building regulations and codes.
  • When the plans are mutually agreed and plans signed off, a contract is drawn up by our legal team, when this is fully agreed and signed, we start the manufacture process.
  • All elements for the house /project at the contract stage are confirmed and agreed. All elements and responsibilities for each party are also defined.
  • The deposit stage.
  • The structure /frame of the house / project is put into production.
  • The materials for the house/project is ordered.. Like insulations.. Boards, Plaster boards, Roof tiles, wiring, water pipes, windows and doors, and finishing materials.
  • Delivery of the house date is confirmed ( the foundation and base MUST be ready at this stage)
  • Stage payments made.
  • Delivery of the structure and materials.
  • House building commences with frames erected.
  • Stage inspections are carried out by local regulators at each stage of the build.
  • Build is complete
  • The building is signed off with local architect and local regulators.
  • ( the local authority will/can test the build for Heat loss and air tightness and certify thereafter).

detailed plans 1

To Note: The structures  are manufactured to be compliant with any LOCAL building regulations and codes, the materials for walls ceilings, internal walls, floors and roof systems will be compliant for the local area regulations for Heat Loss and air tightness.

Important feature for our clients with all of our Buildings.

When the house is finished the owner will have a full specification breakdown database of all the components used in the manufacture and build of each element- roof –ceilings-internal and external walls etc. Showing the manufacturer details with Specifications and values.

All of our buildings are covered by our 10 year NHBC or Premier Home Guarantee as standard (only applicable in the UK).

NHBC badge  premier badge

For more information on what we can do for you please call us now or e mail to info@greenhomebuilder.co.uk

 

 

 

 

 

 

 

 

Filed Under: procedures, Slider Featured, Standard Designs

October 1, 2012 By Craig McIntosh

Green sustainable Buildings

Green Sustainable Buildings.

innovation

Filed Under: Slider Featured, Uncategorized

October 1, 2012 By Craig McIntosh

Commercial Buildings

commercial centre

Filed Under: Slider Featured, Uncategorized

October 1, 2012 By Craig McIntosh

Sustainable materials

Filed Under: Slider Featured, Uncategorized Tagged With: Images Centered

  • Go to page 1
  • Go to page 2
  • Go to Next Page »

Primary Sidebar

Email Newsletter

Sign up to receive email updates.

Search

Recent Articles

  • Barrats to use more steel frames for their new houses
  • Bi Folding door instalations
  • Renovation Project using smart glass
  • Top 10 Reasons for using steel frames
  • Latest projects from October -16 to January -17
Mark Bishop in london, Hertfordshire, UK on Houzz
  • Facebook
  • Google+
  • Twitter

Footer

Company Details

229 Purley way
Croydon CR2 5HR
England
United kingdom
info@greenhomebuilder.co.uk
m: 07599 881 096

  • Facebook
  • Google+
  • Twitter
Mark Bishop in london, Hertfordshire, UK on Houzz

Recent Articles

  • Barrats to use more steel frames for their new houses
  • Bi Folding door instalations
  • Renovation Project using smart glass
  • Top 10 Reasons for using steel frames
  • Latest projects from October -16 to January -17
  • Aluminium bi fold door ideas

Search

Tags

Images Centered Unordered Lists

© Copyright 2015 Green Home Builder · All Rights Reserved · Created by Craig McIntosh · Privacy Policy · Disclaimer · Terms of Use · Linking Policy · Anti Spam · Cookie Policy