This renovation project was started January 2016 and completed April 2016, the project involved completely removing the rear elevation ground floor wall and left side , inserting steel RSJ’s and extending the building footprint 3m longer and 2.5m wider on the garden side, the garden became the “‘outside dining area”” using 44mm triple glazed smart active glass on the roof and double glazed toughened laminate in the vertical frames ..we installed a Beckerman Kitchen and island and added an extra bathroom fully tiled and a walk in closet in the master bedroom, this was a complete make over.