• Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Green Home Builder

  • Home
  • About Us
    • About The Team
    • Production
    • Sustainability
    • Why Build with Steel?
    • Light Steel Industrial Structures
  • Articles
  • Procedures
  • Standard Designs
  • Portfolio
  • Contact
You are here: Home / Slider Featured / Latest projects from October -16 to January -17

February 27, 2016 By Mark Bishop

Latest projects from October -16 to January -17

 

Green Home Builder UK (GHB-UK) specialize in the design, manufacture( though our partners) and installation of light steel Modular type buildings.. The light gauge steel frames are extremely versatile they can offer extensive scope in design and with massive configuration innovations making this a really super way to build many types of structure.

Our Buildings are built mostly using steel meaning our light gauge frames are made from Galvanised steel which is rolled and processed to order, then cut and pre drilled, before being pre-built into the relevant sections.

Then each section is coded and batched together with a number of similar panels in a batched sequence before the delivery to site. This ensures that all frames can be unloaded and assembled on site with maximum speed and efficiency.

The GHB-UK team is constantly applying and improving innovation to all stages including design manufacture and build stages.

We believe that our expertise in light steel frames construction, combined with our ongoing partnership with VIP BG enables GHB-UK to offer unequalled levels of service, quality and excellent value for money.

You  can see  below from 3 D visualization of the project first, to the frame layout on site , first floor frames installation, then 2nd floor then roof then building enclosure, the whole process in this project took around 6 weeks, this house will be finished end of january 2017, our buildings are highly efficient to build and own, the sites are very clean with minimal waste and are highly cost effective not just to build but also to run on a yearly basis.

 

Frame lay out on site

Ground floor level
First floor level

Building starting to be enclosed

 

This 250m2 4 bedroom house is being built now- it was started October 2016 and is on going – EDD is end January 2017.

Filed Under: Slider Featured, Uncategorized

Want to know more about how affordable a green home is?
Contact Us

Primary Sidebar

Email Newsletter

Sign up to receive email updates.

Search

Recent Articles

  • Barrats to use more steel frames for their new houses
  • Bi Folding door instalations
  • Renovation Project using smart glass
  • Top 10 Reasons for using steel frames
  • Latest projects from October -16 to January -17
Mark Bishop in london, Hertfordshire, UK on Houzz
  • Facebook
  • Google+
  • Twitter

Footer

Company Details

229 Purley way
Croydon CR2 5HR
England
United kingdom
info@greenhomebuilder.co.uk
m: 07599 881 096

  • Facebook
  • Google+
  • Twitter
Mark Bishop in london, Hertfordshire, UK on Houzz

Recent Articles

  • Barrats to use more steel frames for their new houses
  • Bi Folding door instalations
  • Renovation Project using smart glass
  • Top 10 Reasons for using steel frames
  • Latest projects from October -16 to January -17
  • Aluminium bi fold door ideas

Search

Tags

Images Centered Unordered Lists

© Copyright 2021 Green Home Builder · All Rights Reserved · Created by Craig McIntosh · Privacy Policy · Disclaimer · Terms of Use · Linking Policy · Anti Spam · Cookie Policy